 > 鋼鐵結構工程 > 香港賽馬會沙田馬場改建及加建工程-鋼鐵結構工程,臨時鋼結構工程,防火油工程
 > 鋼鐵結構工程 > 香港賽馬會沙田馬場改建及加建工程-鋼鐵結構工程,臨時鋼結構工程,防火油工程




證書:ISO 9001
材質:S355J0H S355J2H
交貨期:7-35天
差異化服務:接受小型工程
煌商佑鋼鐵承接鋼結構工程(Steel structure Engineering),鐵器工程,五金冷貨,(Steel Metal Works),不鏽鋼工程,Stainless steel Engineering的分判商。
同時為建築公司供應鋼鐵製品及五金冷貨製品及不鏽鋼製品,我們擁有自己的加工廠,保證交貨期及品質。
煌商佑鋼鐵從工程概念設計到完成階段性的項目,我們為客戶提供複雜的結構設計,包含連接細節,提供施工圖及工程計算,安裝方案,入則BD、出結構圖則及施工圖則,Drawing supply以確保工程順利進行。
我們為客戶提供Design &Shop Drawing,Fabrication,Installation,Dismantle。
我們確保我們是你首選的值得信賴的分包商。
We ensure that we are the trustable sub-contractor of your first choice。
工程現場圖片/Engineering photos:
|  |  | 
| 
					Temporary Steel Deck for CLP Cable and Comm.  
					Duct HKIA 3303 – Third Runway and Associated Works | 
					ALTERATION AND ADDITION WORKS AT  
					SHATIN RACECOURSE FOR THE HONG KONG JOCKEY CLUB | 
|  |  | 
| 
					KL2014/01-Kai Tak development – infrastructure  
					works for developments at the southern part of theformer runway | 
					SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Squareat Kai Tak Phase | 
|  |  | 
| Contract No.: SPW 08/2018Landscape and Greening Works at Cyberport Preliminary Treatment works | 
					HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR TAI WOHAU Station Exit B  | 
工程業績/Job reference:
| HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR | 
					Hing Fu Engineering CompanyLtd | 
| 
					Temporary Steel Deck for CLP Cable and Comm.Duct HKIA 3303 – Third Runway and Associated 
					Works | 
					3303 SAPR JV | 
| 
					SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Square at Kai Tak Phase | 
					SFK-CEC Joint Venture | 
| 
					KL2014/01-Kai Tak development – infrastructureworks for developments at the southern part of the 
					former runway | 
					CEC-CCC JV | 
| 
					Main Contract (Phase 2A works) – Metal Fence andTrellis Cable System,Stainless Door of Proposed ChuKong New Terminal Facilities, Tuen Mun Town LotNo.491, New Territory | 
					ConcentricConstruction Co.,Ltd. | 
| 
					HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works | 
					Rich Crown Engineering Ltd | 
| Contract No.: SPW 08/2018 Landscape and Greening Works at Cyberport Preliminary Treatment works | FUNG SHING STEEL CO.LTD | 
| 
					3303/SC/M041 Design, Supply and Delivery of Stainless Steel Works for Construction of BoxCulverts, Underground Utilities and WVT | 
					3303 SAPR JV | 
立即獲取免費報價!Get Your Free Quotation Today!
請致電任生: 
Phone:+852-65561469 
WhatsApp:+852-65561469 
E-mail:king@ulsteel.com
谢小姐
Phone:+852-92991977
WhatsApp:+852-92991977 
E-mail:hkhuangshangyou@ulsteel.com