 > 鋼鐵結構工程 > 鋼結構工程,佐敦廣場天面冷氣鋼架,天面鋼結構工程,鋼鐵結構工程,永久結構工程,Steel Metal Works
 > 鋼鐵結構工程 > 鋼結構工程,佐敦廣場天面冷氣鋼架,天面鋼結構工程,鋼鐵結構工程,永久結構工程,Steel Metal Works




證書:ISO9001 ISO14001 OHAS18001
材質:S275J0 S355J0 S355J2 S450J0 S450J2
交貨期:7-30天
差異化服務:小批量訂單及加工,價格公道
	煌商佑鋼鐵承接鋼結構工程(Steel structure Engineering),鐵器工程,五金冷貨,(Steel Metal Works),不鏽鋼工程,Stainless steel Engineering的分判商。
	同時為建築公司供應鋼鐵製品及五金冷貨製品及不鏽鋼製品,我們擁有自己的加工廠,保證交貨期及品質。
	
	煌商佑鋼鐵從工程概念設計到完成階段性的項目,我們為客戶提供複雜的結構設計,包含連接細節,提供施工圖及工程計算,安裝方案,入則BD、出結構圖則及施工圖則,Drawing supply以確保工程順利進行。
	
	我們為客戶提供Design &Shop Drawing,Fabrication,Installation,Dismantle。
	
	我們確保我們是你首選的值得信賴的分包商。
	We ensure that we are the trustable sub-contractor of your first choice。
工程現場圖片/Engineering photos:
|   |   | 
| 
					Temporary Steel Deck for CLP Cable and Comm. 
				 
					Duct HKIA 3303 – Third Runway and Associated Works
				 | 
					HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works
				 | 
|   |   | 
| 
					KL2014/01-Kai Tak development – infrastructure 
				 
					works for developments at the southern part of theformer runway
				 | 
					SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Squareat Kai Tak Phase
				 | 
|   |   | 
| Contract No.: SPW 08/2018Landscape and Greening Works at Cyberport Preliminary Treatment works | 
					HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR TAI WOHAU Station Exit B 
				 | 
	
	工程業績/Job reference:
| HY/2019/17 Retrofitting of Escalators for Footbridge Across Castle Peak Road – Kwai Chung Near MTR | 
					Hing Fu Engineering CompanyLtd
				 | 
| 
					Temporary Steel Deck for CLP Cable and Comm.Duct HKIA 3303 – Third Runway and Associated
				 
					Works
				 | 
					3303 SAPR JV
				 | 
| 
					SS G506 – Glass railing, ironware, glass canopy, steelframe, stainless steel of construction of Station Square at Kai Tak Phase
				 | 
					SFK-CEC Joint Venture
				 | 
| 
					KL2014/01-Kai Tak development – infrastructureworks for developments at the southern part of the
				 
					former runway
				 | 
					CEC-CCC JV
				 | 
| 
					Main Contract (Phase 2A works) – Metal Fence andTrellis Cable System,Stainless Door of Proposed ChuKong New Terminal Facilities, Tuen Mun Town LotNo.491, New Territory
				 | 
					ConcentricConstruction Co.,Ltd.
				 | 
| 
					HKIA 3303 Temporary Steel Working Platform For AGL Pile Cap Works
				 | 
					Rich Crown Engineering Ltd
				 | 
| Contract No.: SPW 08/2018 Landscape and Greening Works at Cyberport Preliminary Treatment works | FUNG SHING STEEL CO.LTD | 
| 
					3303/SC/M041 Design, Supply and Delivery of Stainless Steel Works for Construction of BoxCulverts, Underground Utilities and WVT
				 | 
					3303 SAPR JV
				 | 
	
	立即獲取免費報價!Get Your Free Quotation Today!
	請致電任生: 
	Phone:+852-65561469 
	WhatsApp:+852-65561469 
	E-mail:king@ulsteel.com
谢小姐
	Phone:+852-92991977
	WhatsApp:+852-92991977 
	E-mail:hkhuangshangyou@ulsteel.com